Server Change Procedure

Recommend to change server after close, not during business hours

Nancy Liu

Last Update 10 maanden geleden

Server Side:

  1. Make a backup of the current server (if server is online), and clone the backup to the new server

  2. Go to POS access → click on the top left dehaze icon

  • Change timezone of new server

  • Sync time of the new server and make sure time is correct

  • Check License (to

  • Check IP: Add all static IPs that the old server has (or check all devices and add IP of all network segments in the server)

In POS:

  • If pictures of the menu are missing, need to check with Lv2 to restore from backup

  • Re-upload the logo from advanced - Upload files → Logo for receipts (if logo of cc receipt is missing)

  • Enter a test order to make sure ordering is good (remember to void)


In Portal:

  • Move merchant info from old server to new server

  • Move the 3pp business info from the old server to the new server

  • Ask Finance to update the sitename of the new server with the sitename of the old server (in order for online ordering to work, and to link all history invoices to the new server)

  • Ask Finance to activate the new server (in order to remove demo mode)



Note: If it is switching from a virtual server to a real server, remember to stop the virtual server from the client computer, and remove the auto start program.